Abschnitt 5.2 – 5.2 Load pick-up and load drop-off places
Load pick-up and load drop-off places on outside working stations must be suitable for the planned work assignment. The following requirements are therefore to be taken into account, among others:
sufficiently large and suitable spots
clear division in exterior landing place and load pick-up and drop-off place
creation of options to use Personal Protective Equipment at work places at heights by the employer, allocation of suitable fastening points for the PPE of the insured individuals against falling